Hi Gurus,
i want to have a scheduled mrp run seperately for a material. (with reorder level). I have found MPS (M1 type) as an option.
Please tell me settings & steps in detail for this.
Regards,
Amit
Hi Gurus,
i want to have a scheduled mrp run seperately for a material. (with reorder level). I have found MPS (M1 type) as an option.
Please tell me settings & steps in detail for this.
Regards,
Amit